Andover Town

Andover, Hampshire, UK

  • Home
  • Sport
  • Events
  • Community
    • Andover Charities
    • Reporting Issues
  • Businesses
    • Andover Business Parks
    • Andover Business Networking Groups
    • Eat & Drink
      • Breakfast in Andover
    • Shop
    • Stay
  • Campaigns
    • Valentine’s Day in Andover
    • London Marathon
    • Andover Rejuvenation
    • Neighbourcare
    • County Elections
      • Andover Election Results 2013
      • Andover Election Map
      • Andover North
      • Andover South
      • Andover West
      • Test Valley Central
      • Email to Candidates
  • Articles
  • Links
    • Andover Politics
  • Competitions

How Will Hampshire Spend The Pothole Money?

June 27, 2014 by Andover Town

Hampshire County Council has set out how it will be making the most of the money allocated from Government as part of the national Pothole Repair Fund.

Hampshire received £6million, one of the largest amounts allocated in the South. It is one of the local authorities which the Government has said “demonstrates best practice in highways maintenance“.

Prime Minister David Cameron said the funds were being given in response to the work already carried out across the county to tackle the problem, and that “Hampshire County Council has shown it is one of the leading areas in the country in its determination to beat potholes, and is receiving extra cash as a result.”

Councillor Seán Woodward, Executive Member for Economy, Transport and Environment at Hampshire County Council, said: “This money is certainly welcome as there is a great deal of work to be done to repair the damage done to the roads during the recent long and exceptionally wet winter. Our initial estimates came to around £36million, so this £6million added to the £11.5million received from Government last month is very welcome but means we are not yet able to finish all the work needed to get the roads back to the condition they were in before the winter.”

“The Government has recognised Hampshire as one of the local authorities which will ensure the money is spent wisely and effectively. In recent years, Hampshire has switched to a longer term management approach in the way the roads are repaired. This means that the highway network is managed as an asset with decisions of what treatment needs to be carried out, at what time, based on ‘whole life’ costings to reduce expensive reactive repairs in the future. If we hadn’t adopted this approach, the effect of the winter on the roads would have been much worse.”

“Good roads are a priority for Hampshire County Council and we’re getting on with the work right away, with extra gangs, extra machinery and equipment.”

How Hampshire County Council plans to use the £6million on Hampshire’s highways network:

#1
£1million on bringing in extra Jetpatching machines which are ideal in the current good weather. These are high speed patching machines which can fix numerous smaller defects. Bitumen emulsion bond-coat is forced deep into cracks, crevices and potholes to improve the adhesion. Bitumen emulsion and an appropriate aggregate are mixed, then immediately compacted into the void at high velocity. The result is a level, sealed repair that quickly blends into the existing surface. The repair is completed within a few minutes and is immediately ready for traffic, reducing costly traffic management and minimising disruption to motorists.

#2
£1million on hiring multihog machinery and deploying small patching gangs. The multihog gives highways maintenance crews the ability to repair up to 200 square metres of road in just one day. The single piece of equipment can plane out the existing road and is immediately followed up with a new road surface. This means repairs can be made more speedily than by hand or with the use of a mini-planer which, in turn, means less traffic disruption and a greater number of defects repaired in a shorter space of time.

#3
£2.35m on repairs to haunches and road edges, which strengthens road structures and ride quality.

#4
£1m on patching larger areas using machine lay for areas of road up to 30m in length across the entire width of the carriageway

#5
£0.25m on a programme in urban areas fixing ‘bellmouths’ of junctions where the joints are beginning to fail and crack

#6
£0.25m on a programme of joint sealing and concrete joint repairs with new surfacing to protect water impress leading to greater damage in future.

#7
£0.15m on infrared repairs which heat up the road material to allow lasting repairs to cracks and wall voids and are particularly effective around gullies and metal work

To see how Hampshire County Council uses different equipment and techniques in different locations, take a look at these short films.

Residents can report potholes and other highways defects online or by calling 0845 603 5633 or at the link below:

Report road problems in Hampshire

Filed Under: News

Latest News…

Surveillance Drone Comes to Andover

Surveillance Drone Comes to Andover

Andover Armed Forces Day has announced the appearance of one of the British Army’s ‘spies in the skies’. [Read more…]

New Headmaster For Rookwood

New Headmaster For Rookwood

Rookwood School in Andover has announced the appointment of a new headmaster in Anthony (Tony) Kirk-Burgess who will take up the post from 1 September 2017. [Read more…]

Andover’s Only Chelsea Pensioner Returns For Armed Forces Day

Andover’s Only Chelsea Pensioner Returns For Armed Forces Day

A splatter of colour in both tunic and tales comes to Andover later this month as the town’s only Chelsea Pensioner heads back to the town. [Read more…]

Get a Free Stand at Andover Armed Forces Day

Get a Free Stand at Andover Armed Forces Day

Buy a half page advert in the Andover Armed Forces Day brochure and you can have a stand space free of charge on the day. [Read more…]

Cllr Ian Carr Retains Conservative Group Leadership on TVBC

TVBC Leader to Stand Down

TVBC Leader Councillor Ian Carr has announced he is to stand down in May 2017. In a press release, he said: After 18 years in the role, I have made […]

More Posts from this Category

Comments

  1. Liz Ferla says

    June 27, 2014 at 11:50 am

    I presume all contracts will be put out to tender, not jobs for the family, and all work must be guaranteed. Written into contract that any work done will be guaranteed for 12 months!

Follow Us on Social Media

  • Facebook
  • LinkedIn
  • Pinterest
  • Tumblr
  • Twitter

Local Advertisers

Andover Weather Forecast

Public Notices

Temporary Road Closure Order – Part of Millway Road and Mylen Road Andover

October 18, 2015

Temporary Road Closure Order – Newbury Road, Andover

October 18, 2015

Temporary Road Closures for the St George’s Day Parades in Andover and Romsey

April 6, 2015

More Posts from this Category

Search The Site

Translate the Site

Fuel Prices in Andover

Subscribe to Our Newsletter

Add your name and email address and we will send you periodic emails about news in the town.

Latest News Items

  • Surveillance Drone Comes to Andover
  • New Headmaster For Rookwood
  • Andover’s Only Chelsea Pensioner Returns For Armed Forces Day
  • Get a Free Stand at Andover Armed Forces Day
  • TVBC Leader to Stand Down

Tell Us

Got some news you want to tell us about? An issue you want aired? Then get in touch.

Social Media

Facebook
Google+
Twitter
You Tube

Andover Town Website

About
Contact
News

Posts by Month

Advertise Your Business

Advertise your event or business with the Andover Town website - from just £20 a month

Copyright © 2026 · Metro Pro Theme on Genesis Framework · WordPress · Log in